Asset Preservation for Owner-Operators: Protecting Your Path to Revenue

In the oil and gas industry, every day your facility is offline represents millions of dollars in lost opportunity. Whether you are managing new capital projects or a critical turnaround, the speed of your transition to operational status is the ultimate metric of success.

The greatest threats to your timeline aren't always the big logistics—they are the small, preventable failures: corrosion on flange faces, mechanical impact damage, and foreign material exclusion (FME) breaches.

 

 

Why Leading Owner-Operators Prioritize P3 Preservation

Delays caused by damaged piping components don’t just move the schedule; they cripple it. When a flange face is found corroded or gouged during installation, the project stops for resurfacing. When debris is found in a piping run, commissioning is halted for additional cleaning.

The P3 Patented Preservation System changes the math by ensuring every asset is "Ready for Install" the moment it arrives on site.

Financial Impact of Proactive Preservation:

  • Zero-Rework Milestones: Eliminate the need for onsite flange resurfacing and internal pipe cleaning.
  • Predictable Commissioning: Achieve your startup date—or beat it—by removing the "find and fix" cycle from your critical path.
  • Reduced Total Cost of Ownership (TCO): Extend the lifecycle of your assets from day one by preventing early-stage degradation.

 

The Patented P3 Advantage: Airtight, Watertight, Certain.

Our system isn't just a cover; it is a comprehensive preservation barrier. We provide a proven solution that has been trusted by global majors including Shell, Exxon, Chevron, and BP.

  • Airtight & Watertight Seals: Stops the oxidation process in its tracks by preventing moisture and oxygen ingress.
  • VCI Integration: Certain product lines are embedded with Volatile Corrosion Inhibitors (VCI) to provide active protection for internal surfaces without the need for messy oils or coatings.
  • Mechanical Integrity: High-impact protection that shields gasket surfaces from the rigors of shipping, crane movements, and staging.

 

From Fabrication to First Oil: We Protect Every Stage

Piping assets are at risk from the moment they leave the fabrication shop. We provide the tools to ensure integrity through:

  • Long-Term Storage: Maintaining asset health during multi-year project delays or staged construction.
  • Global Shipping: Protecting against salt spray and extreme humidity during ocean transit.
  • Onsite Staging: Shielding components from construction debris, sandblasting grit, and environmental exposure.

 

There is now a way you can significantly reduce if not eliminate piping component damage, allowing you to achieve your construction schedule milestones, then commission and start your project on or ahead of the scheduled date. Using this process you will all but eliminate the need for removing corrosion, resurfacing flanges, and cleaning debris from your piping system components. What does this look like?

Our patented preservation system will allow you to achieve this! It creates an airtight/watertight seal of your piping assets, stopping corrosion, stopping flange damage, and stopping debris in your piping components. It has a proven track record on projects for Shell, Exxon, Chevron, BP…. We can help you save time, save money, and produce revenue sooner on your Oil and Gas facility project.

Owner Operators in Oil and Gas lose millions due to flange damage and corrosion.

NOW IT'S YOUR TURN!

Contact us today and protect and preserve your piping components and mechanical equipment.

Get A Quote Now

Ask A Quick Question

fields marked with * are required


Our #1 priority is that you become more productive & profitable. Please fill out this form, & our team will get back to you shortly.

We are committed to developing & supplying products that will save you time, save you money & help you produce a better quality product.